Plumbing
The pipes had to be routed around the skimmers and between the existing limestone decks. The plumbing for the floor returns was trenched and recessed below the structure, so as to maintain the proper shell thickness — a common mistake a lot of builders make. Note the waterstop flange on the floor return riser. Halfway through the shotcrete process, it was lowered down and topped with cement.